What we do
Eight disciplines,
one set of hands.
We are small enough that the person who sketches your building also draws its window junction and stands on site while it is built. These are the eight things that involves.
What we do
We are small enough that the person who sketches your building also draws its window junction and stands on site while it is built. These are the eight things that involves.
01 — Disciplines
No discipline here is subcontracted. If it is on this list, it is drawn in the studio by someone whose name is on the team page.
01
New buildings and substantial alterations, from first sketch through to the year-five visit.
Covers
02
The inside of a building treated with the same seriousness as its envelope, and usually by the same hands.
Covers
03
Keeping what is already standing. Structurally the hardest work we do, and the work we most want.
Covers
04
Testing how a surface behaves over years rather than in a showroom, and writing down what we find.
Covers
05
Pieces designed for one room, usually because nothing on the market fits the dimension we drew.
Covers
06
The ground a building sits on, handled early enough to change where the building goes.
Covers
07
Daylight first. Electric light only where daylight cannot reach, and never more of it than the room needs.
Covers
08
Temporary work, where the whole life of a structure is three weeks and everything has to come apart again.
Covers
02 — Engagement
Disciplines describe what we can do. Two other pages describe how any of it reaches you, and what it costs.
The site, the brief, the way you live.
2–4 weeks
Sketches, models, material studies.
4–8 weeks
Every junction, drawn and specified.
3–6 months
On site, beside the people making it.
Through to completion
We come back at one year, and at five.
Year one, and year five
03 — Limits
A practice that says yes to everything is telling you nothing about itself. Three kinds of work we decline, and the reason in each case.
We are nine people. We cannot give forty units the attention we give four, so we do not take the work.
We have never produced anything worth building for a site we have not stood on.
We specify what a room is made of. We do not dress it for a photograph.
04 — Start a conversation
If you are not sure, say so. Working out which discipline a problem belongs to is the first thing we do anyway, and it costs nothing.